CURRENT . P R O J E C T S A selection of projects demonstrating CMM's detailing capabilities.
|
|
|
|
GLASGOW
CALEDONIAN UNIVERSITY
Our brief was to produce full working drawings for the centrepiece 21m high atrium and extensive clerestory glazing. The production phase entailed CMM producing over 250 working drawings.All 2D Working drawings were derived fromCMM's 3D autocad models
PROJECT TEAM Client : Systems Aluminium Design architect : BDP Structural Engineer : Will Rudd Roxburgh Main Contractor : Balfour Beattie
|
|
|
|
|
|
SHEFFIELD WINTER GARDENS Specialist glazing contractor HARAN GLASS employed CMM as consultants to produce over 200 working drawings for this high profile £12M contract. CMM's specific brief was the integration of the glazed envelope with a composite structure of glu-lam timber arches and stainless steel connectors. PROJECT TEAM Client : Haran Glass/Sheffield City Council Design architect : Pringle Richards Sharrat Structural Engineer : Buro happold
|